Per Nevada Department of Transportation: Beginning on Monday, August 14th, 2023, “Drivers should anticipate single lane closures with extensive travel delays between 6a.m.-6p.m. weekdays on U.S. 95 from the north end of Walker Lake to the U.S. 95A junction at Schurz.”
More Stories
Walker Lake Zephyr Blows Over Semi-Trucks “Like Toys”: Saturday, December 14, 2024
Lane Closures on Sections of US 95A Between Yerington & Silver Springs After Rail Repairs
Roadwork: 95A @ Burch Drive to Hwy 339 Intersection with Goldfield in Yerington